The final design of the apartment is the final stage of repair. The final result and the appearance of the room will depend on its correct execution. Where to start repair work, and what recommendations should be followed when they are carried out.
Preparatory work
Proceed to the design of walls, floor and ceilings only after the design project is compiled. In this case, it will be possible to determine in advance the type and quantity of the necessary materials, which will not make unnecessary costs. In addition, with this plan, the implementation of all necessary measures will take less time. Among other things, the project will make an accurate idea of how the apartment will actually look ultimately.
Basic rules
Experts, making turnkey apartments, advise starting to start the finish of any room from top to bottom. This means that the ceiling should be the first to be decorated. The floors are finished last. So you can avoid damage to the newly laid coating as a result of repair work with other constructive elements. In addition, it is recommended to start adjusting measures from the farthest room from the front door of the room. Otherwise, when cleaning various kinds of garbage, carrying paint, etc.e, just decorated surfaces can be stained.
Stages of finishing
– At the first stage, all “dirty work” should be carried out. Start repairs should be with the installation of ceramic tiles. At the same time, it must be placed immediately in all those places in which this is provided by the project.
– Next move to the replacement of plumbing devices. Risers, sunbeds and pipes should already be mounted during black adjustment work. The finish involves the dismantling of the toilet, shells and baths and the installation of new plumbing.
– At the next stage, the surface of the ceiling and walls is aligned by finish putty. This will allow you to get a smooth surface, getting rid of all minor defects and bumps.
– After that, you should start the decorative design of the ceiling. Today, a variety of materials are produced that are suitable for this purpose. You can stick ceiling tiles, mount panels, stretch and suspended structures, etc.d;
– The next stage involves the work on wall decoration. They can be painted, poured with wallpaper, finish with decorative plaster, etc.d;
– Then they begin laying laminate, parquet, linoleum or massive boards;
– At the last stage, interior doors are replaced. Before the floors are finished, it is impossible to start doing this work. It will also be necessary to mount sockets and switches.
If you carry out repairs in stages, and adhering to the plan prepared in advance, in the end you can get an excellent, high -quality design of the apartment.