Obtaining the allowance for the construction of new facilities

Obtaining the allowance for the construction of new facilities

New construction work that potentially affect the safety of facilities require appropriate tolerance and permission from the competent authorities. Therefore, in order to implement such engineering surveys or design work, it is urgent to get a SRO allowance before the start of capital construction. Such admission is necessary if it is planned to prepare design documentation and other works related to the safety of buildings.

To get the allowance of SRO, you should collect quite a few documents. You will need copies of the certificate of registration of the company, certified by the institution and papers confirming the registration. Along with this, you will have to collect a number of documents confirming the rights of property or lease at the location of the organization. Moreover, you should provide a protocol or decision on the appointment of the head of construction work, as well as contact details, bank details and other information about the company-builder.

The next step is to receive a certificate of admission. To obtain it, it is necessary to decide on the types of work carried out, as well as to equip the team of workers, in accordance with their skills and experience. Also, you should collect copies of constituent papers and diplomas of selected specialists confirming their qualifications. After that, the form of form is filled out and a civil liability insurance contract is concluded.